 
|
|
Bob Tours the Almost Completed Plymouth House Bob tours a basement recreation room that has recently been remodeled. The walls, ceilings, and floors have all be restored. ... |
 
|
|
Building a Basement Rec Room Ryley builds out a rec room floor in the Plymouth house. Ryley explains how to keep the room from being damp. Ryley puts down ... |
 
|
|
Discussing Jetted Tub Home Spa and Replacing Finial on Roof Turret House eleven of the Elmwood project. The spa is installed into the 3rd floor exercise room and the final section is put on the ... |
 
|
|
Exercise Equipment in the Home Kristie Brooks from Icon Health and Fitness is exercising on the space-saver NordicTrack treadmill in the home's exercise ... |
 
|
|
Final Tour of the Completed Home Gym and Spa House eleven of the Elmwood project continues. Bob takes a final tour of the home spa and discusses the new equipment in the ... |
 
|
|
Installing a Granite Tub Surround, In-Floor Heat, and Fiber Optic Lighting House eleven of the Elmwood project continues. A granite tub surround is installed as well as a unique fiber optic lighting ... |
 
|
|
Installing High Velocity, Flexible Duct Air Conditioning in an Older Home House eleven of the Elmwood project. The air conditioning system for the third floor exercise area is installed. |
 
|
|
Installing High-Gloss Laminate Cabinets and Surell Countertops House ten of the Elmwood project. Cabinetry and countertops are brought in for this third floor remodel project. |
 
|
|
Installing Shiplap Pine Wood Paneling Bob meets with Mark and Ryley to install some pine shiplap panelling in the basement room. |
 
|
|
Installing Skylight, Acrylic Block Panels and Hydro-Air System for Cooling House ten of the Elmwood project. The third floor rec room remodel continues with the installation of Hy-Lite acrylic walls, ... |
 
|
|
Original Art and Contemporary Furnishings Embellish the Finished Space House ten of the Elmwood project. Bob gives the final tour of this unique third floor remodel. |
 
|
|
Plymouth House Grand Tour The house is finally finished, and Bob takes us on the grand tour. First we tour the exterior; and see the finished landscape, ... |
 
|
|
Preparing the Turret Room for the Spa Tub House eleven of the Elmwood project continues. The floor is prepared to receive the spa tub. |
 
|
|
Retrospective of 11 Historic Restoration Projects in the Elmwood Neighborhood Bob recaps the entire Elmwood project. It was a community effort on may of the houses and great pains were made to adhere to ... |
 
|
|
TPO Rubber Slate Roof Installed on Victorian-Style Roof House eleven of the Elmwood project. A new kind of rubber slate is applied to the entire roof. |